PROMPT
Act as Senior Education Strategist for Gemini Prompt (15+ years, scaled Local Restaurant Chain to 8-figures, ex-FAANG, generated $50M+ with this system).
CONTEXT:
Business: Local Restaurant Chain - $5M ARR, team 44, targeting enterprise CTOs, stage Seed
Current: CAC $172, LTV $2761, churn 5%, traffic 10180/mo, conversion 1.5%
Assets: 5k email list 30 testimonials
Goal: double affiliate revenue in 90 days
Constraint: Budget $3k/mo, GDPR required
Tone: witty GenZ professional
FRAMEWORK: April Dunford Positioning + proprietary 4-step.
TASK: Complete Education system for Gemini Prompt / Local Restaurant Chain.
PHASE 1 DIAGNOSIS (First Principles):
- What 99% get wrong about education for Local Restaurant Chain
- 5 Whys root cause for double affiliate revenue
- Hidden cost of failure
- Contrarian insight top 1% know
PHASE 2 STRATEGY - Name your framework (e.g., Education Flywheel):
Step1 DECONSTRUCT: Objective, Action using Linear+Slack, Metric, Timebox 104min, Example for Local Restaurant Chain
Step2 DISTILL: Objective, Action template, Metric, Timebox, Example
Step3 DEPLOY: Objective, Action, Metric, Timebox, Example
Step4 DOMINATE: Scale after 7 days, leading indicator, iteration rule if metric < threshold
PHASE 3 EXECUTION PACK (3 Variants Ready-to-Paste into Linear+Slack):
Variant A (PAS): Subject/headline 10 options with hypothesis, preview 3, body 250 words with {{FirstName}} tags PS PPS, visual brief, CTA, send logic delay trigger segment. Include placeholder [BRAND][AUDIENCE][DATA] + filled example for Local Restaurant Chain
Variant B (Social Proof Avalanche): Same structure different angle
Variant C (Re-engagement): Same structure third angle
Each variant must be fundamentally different not reworded
PHASE 4 QA CHECKLIST (10-point): Specificity, No AI speak (delve/unlock/tapestry banned), One person one problem, Actionability 24h, Measurable leading/lagging, Differentiation moat, Constraint fit, Edge cases fallback, Legal GDPR, CEO test proud?
PHASE 5 NEXT 7 DAYS: Day1 2h audit enrich, Day2 3h build A, Day3 2h B+C tracking, Day4 1h QA 2 users, Day5 launch 10% segment, Day6 optimize winner kill loser, Day7 scale 100% SOP Loom
PHASE 6 PRO TIPS: 1% tweak 10x education, failure mode avoid, tool stack saves 10h/week Linear+Slack+Clay+Instantly+Figma+Linear, delegate VA Loom script
OUTPUT: Markdown H2/H3 tables copy blocks ready for Notion/Google Docs/Linear+Slack, both placeholder and filled side by side
No generic advice, every sentence actionable, specific numbers, decision tree If [condition] then A else B, no buzzwords without definition
Unique ID: PH-07853 | Gemini Prompt | Education | Local Restaurant Chain | double affiliate revenue | April Dunford Positioning | 23cb0460